Envo Facilities was appointed to supply and install a Heatstore 9kW, 1500mm wide air curtain at the NHS facility located within Manor Walks Shopping Centre. The installation aims to improve energy efficiency, maintain internal temperatures, and enhance comfort for staff and visitors by reducing heat loss at busy entrance points.

The Challenge

  • Supply and install a Heatstore 9kW electric air curtain.
  • Provide new 3-phase electrical supply including circuit protection.
  • Carry out installation safely within a public NHS environment.
  • Ensure minimal disruption to ongoing operations.
  • Perform works outside normal hours to maintain service availability.

Our Approach

Air Curtain Supply & Installation

We supplied and installed a Heatstore 9kW air curtain measuring 1500mm in width. The unit was mounted using manufacturer-approved hardware and aligned to maximise airflow coverage across the entrance. The installation ensures warm air retention inside the premises while reducing draughts caused by frequent door openings.

Electrical Supply Installation

A new 3-phase electrical supply was installed, complete with circuit protection and fully certified connections. This ensured safe operation of the high-power heating equipment and compliance with BS 7671 electrical standards.

Out-of-Hours Work

To avoid disruption to NHS operations and visitor access, all works were completed outside normal operating hours. This allowed safe access to installation areas and ensured that services remained fully operational during daytime periods.

Results Delivered

  • New Heatstore 9kW air curtain installed and fully operational.
  • Improved internal temperature stability and reduced energy loss.
  • Enhanced comfort for staff, patients, and visitors in entrance areas.
  • Safe and compliant 3-phase electrical supply added to the infrastructure.
  • Project completed out-of-hours with no disruption to NHS activities.
Heatstore 9kW Air Curtain Installation Results

Our Environmental Commitment

As part of the Envo approach, all materials were handled responsibly and waste was recycled where possible. We minimised disruption to the facility and worked in accordance with all environmental and sustainability guidelines.